China Intelligent Automatic Tension Equipment Manufacturers|used To Improve Production Efficiency

China Intelligent Automatic Tension Equipment Manufacturers|used To Improve Production Efficiency

Hydraulic tension jack: large tonnage 65-600 tons jack; bridge steel strand jack.
1 2 or 4 jack synchronous tension construction
2 computer to accurately monitor the tension data.
3 Increases labor costs by 80% for tension construction.
Focus on customers, customer service

Product Details

China Intelligent Automatic Tension Equipment manufacturers|used to improve production efficiency

Description of Intelligent Prestressed Tension:

Stressing is important in the prestressed construction of bridges and highways. However there are errors with stressing by humans which will affect the quality of construction. Intelligent stressing equipment is a kind of high technology which can guarantee the high quality of stressing with its accuracy and stability.

1. The intelligent stressing equipment can stress two or four jacks at the same time.

2. It can control the stressing force precisely which can collect the data of tension and add tension automatically.

3. The equipment can be operated conveniently with remote control system.

4. It can do intelligent data analysis and automatic report generation.

Post Tension Intelligent Tensioning Equipment.jpg

Features of Intelligent Automatic Tension Equipment:

1. Control module (1 control 2)

2. On-site monitoring computer (Lenovo Zhaoyang E46A370 notebook computer)

3. Data transmission module (main pump and auxiliary pump 200M range, the main pump and on-site monitoring computer 2KM or less)

4.7 inch touch screen (main pump) text display (vice pump)

5. Displacement sensor (precision 0.1mm) Pressure sensor (accuracy 0.1MPa0

6.High-pressure hydraulic control valve (63MPa)

7. The main pump storage U disk (4G)

Application of intelligent tensioning equipment:

1). For Buildings: Housing, Commercial Buildings, High Rise Buildings.

2). For Municipal Engineering: Railway, Highway, Over Head Fast Speed Way, Metro Way, High-speed Railway, etc.

3). For Projects: Mining, Piling, Foundation, Slope and Rock Reinforcement, Hydropower Station, Anchoring Engineers, Water Conservancy Project, Oil or Gas Tank, etc.