Top Hammer Pneumatic Crawler Rock Drill

Outstanding Drilling Performance:
The advanced design of the boom and hydraulic system assures outstanding versatility and high performance for handling all types of drilling operations. Road construction, dam work, open area drilling, open-pit mining, open cast mines,quarrying operations, tunneling and other drilling operations are all performed with unsurpassed efficiency.
Chat Now

Product Details

Description of Top hammer pneumatic crawler rock drill

Top hammer pneumatic crawler rock drill is a high-grade rig with a stent-type down-hole drilling rig with excellent performance and powerful features. Hydraulic downhole drilling rig, walking downhole drilling rig, open pit drill.

Top hammer pneumatic crawler rock drill is mainly used for open-pit mine mining, hydropower engineering, road construction and other stone works crawler drilling machine operations.

crawler drilling machine91.jpg hydraulic dth drill rig91.jpg


Parameters of Top hammer pneumatic crawler rock drill

ModelsZT100A
Drilling diameterF≈6-20
Drilliing diameter80-130mm
Drilling vertical hole depth30m
Monitor rate20kw
Walking speed2.0km/h
Single climbing ability
30°
Maxiumum lifting force15kn
One push trip3000mm
Working pressure0.5-1.4mpa
Gas consumption7-12m3/min
Rotational speed0-70r/min
Specifications of drill pipe60*2000mm
Total weight3.5t

FAQ

1. Q: Are you trading company or manufacturer?

A: We are original equipment manufacturer.

2. Q: How long is your delivery time?

A: It is according to the model and quantity.

Generally it is 3-5 days if the machines are in stock.

It will be 15-30 days if you want to customize the machines.

3. Q: Do you provide samples? Is it free or extra?

A: Yes, we could offer you the sample machine.

But it's not free. You need to pay for the sample and the cost of freight.

4. Q: What is your terms of payment?

A: We accept T/T, Western Union, Money Gram, Paypal, Alibaba Escrow etc.

Payment<=USD 5000, 100% in advance.

Payment>=USD 5000, 30% T/T in advance, balance before shipment


Inquiry